How Long Does It Take To Order A 2022 Mustang?

Published by Clayton Newton on

If you want a Premium model or the top-spec GT-badged Mach-E, you’re in for a wait of at least 28 weeks.

How long are Ford Mustang orders taking?

Interestingly, almost every 2023 Ford Mustang Mach-E trim is listed with an estimated delivery time of 18-22 weeks, including the Select, California Route 1, and GT. However, Premium models are expected to ship within 18-24 weeks, a bit longer on the high end, though there’s no clear indication as to why.

How long does it take to get a Mustang from the factory?

Typically, you can expect Ford to deliver a factory vehicle within ten weeks of its order date.

When can I order my 2022 Mustang?

2022 Ford Mustang Release Date
The 2022 Ford Mustang is expected during the third quarter this year. You will be able to order your new Mustang before it hits dealerships.

How many Mustangs were in 2022?

Ford Mustang – US – By Year

Year sold
2019 72,489
2020 61,090
2021 52,384
2022 37,212

How long does Ford have between production and delivery?

Probably about 2 months.

How long is Ford built to delivery?

Once its built and no wait on a chip then 3-4 weeks for delivery to dealer via rail/truck.

How long are Ford orders taking?

Placing a Ford factory order is a no-hassle experience because you can select the exact specifications for a current model or one that is about to be released with assistance from our knowledgeable sales staff. The process takes an average of about three+ months.

How many Ford Mustangs are built in a day?

304 Mustangs
About 25 miles southwest of Detroit, the Flat Rock Assembly Plant has been home to the Mustang’s production for the past nine years. It has produced an average of 304 Mustangs per day.

Are 2022 Mustangs in production?

Production of the 2022 Ford Mustang will end at the Flat Rock Assembly plant on November 23th, 2022, while production of the 2023 model will take its place a few days later on November 28th, 2022.

Why are there no 2022 Mustangs?

In a recent interview with the Detroit Free Press, Ford spokesperson, Emma Bergg confirmed that the automaker closed retail orders because of high demand. And because of a current parts scarcity, it can’t produce new units. So, Ford will most likely sell the remaining units and focus on preparing for the 2023 release.

Can you still order 2022 Mustangs?

Ford has not said why new orders are no longer being accepted for any Mustang Mach-E models but it has obviously decided to shift its focus to the 2023 model. “Due to high demand, the current model year is no longer available for retail order,” Ford’s website reads.

Will my insurance go up if I buy a Mustang?

While not as expensive to insure as some luxury cars, Ford Mustang insurance costs are higher than average by $144 per year. Rates can vary depending on your insurer and the model year of your car, so you should shop around to ensure that you get the best deal possible.

How many Mustangs are waiting to be adopted right now?

Approximately 50,000 mustangs are currently in holding pens awaiting adoption, but the number of people taking one home has hit an all-time low in recent years. That’s part of the reason why the federal Bureau of Land Management (BLM) is now offering the financial incentive.

Where are 2022 Mustangs built?

Flat Rock
The 2022 Ford Mustang is manufactured in Flat Rock, Detroit, Michigan.

What state sells the most Mustangs?

One percent of all the passenger cars purchased in Texas are 400+ hp Ford Mustang models.
Who Buys the Most Muscle Cars? —> The Top 10 Most Power-Hungry States.

Rank State % Muscle Cars
1 Texas 5.0%
2 Florida 4.6%
3 Arizona 4.6%
4 Georgia 4.2%

Is it cheaper to order a car from the factory?

All things considered equal, ordered vehicles cost no more than vehicles in dealer stock and, in some cases, may actually cost less. When you buy from dealer stock, you may have to settle for a vehicle with either more or less equipment or your second or third color choice.

What day of week does Ford schedule production?

Is it just the start date of the 4 to 6 weeks until its built? The production date is the Monday of the week your Maverick is scheduled to be built. It might be built on Monday or Friday or any day in-between of that particular week. Ford does not schedule production by day, they schedule by week.

How long does it take Ford to build a custom order?

How Long Does The Custom Order Process Take? Delivery time varies depending on the model so it’s hard to give an exact time frame. Vehicles generally take eight to 12 weeks, however, custom orders will be expedited and can be built and ready for delivery within three weeks in some cases.

How long does it take to build a Mustang?

If you want a Premium model or the top-spec GT-badged Mach-E, you’re in for a wait of at least 28 weeks.

How long after build date will I get my car?

Lead Time for Delivery: 4 to 12 Weeks.
Lead times to get a BTO car can be as little as four weeks, as much as 12 weeks.

Contents

Categories: Mustang